Head to head
Kimi K3vsGranite 4.1 8B
For tasks, about a month.
Verdict · measured basis
Granite 4.1 8B costs $0.0000 per solved task against
Kimi K3 at $0.16 — ▼ 5818x cheaper.
Over 200 tasks that is $33 a month.
On output token price alone Granite 4.1 8B looks 150x cheaper. The ranking holds, but the margin changes.
Verified pricing, pass rate and cost per solved task for Kimi K3 and Granite 4.1 8B| Figure | Kimi K3 | Granite 4.1 8B |
|---|
| Input $/Mtok | $3 | $0.05 |
|---|
| Output $/Mtok | $15 | $0.1 |
|---|
| Cached input $/Mtok | $0.3 | $0.05 |
|---|
| Pass rate | 43% | 64% |
|---|
| Cost per solved task | $0.16measured | $0.0000measured |
|---|
| Cost per month | $33 | $0.01 |
|---|
Cost per month against tasks per month · drag the marker
Solid measured · dashed modeled · dotted stale. The gap is the verdict.
Solvency Bench (solvency.dev) — first-party measurement · verified 2026-08-26 · prices from each provider's pricing page; measured rows ignore the tier · Methodology · All models at these settings